top of page

Electrical Permits

Residents applying for water, sewer and garbage services can apply for an electrical permit at the same time.

The electrical permit is required before Entergy will connect electric service. ​

Electrical Permit:
Fee:

Existing Building or Residence

$10.00

New Construction

$30.00

bottom of page